Structured SMS
Safety Management System active from flight one. Hazard reporting, risk assessment, just culture, FOQA — not a contract appendix, the operating system.
Air Grid Responsibility
Operational safety, ANAC compliance, international standard and environmental impact — treated as preconditions. What shows up on our radar is what comes after that.
SMS culture
Every aircraft management firm in the world has a safety checklist. Very few have a culture — that intangible thing that makes the pilot report a near-miss without fear, makes the mechanic stop an operation on instinct, makes the manager refuse a profitable route when the numbers don't add up.
Air Grid was designed around a simple idea: a safe operation is one where safety is invisible. When nobody has to think about it, it's working. When it's the first thing in every conversation, something is wrong.
That's why we run on structured SMS from the first flight, with just culture (reporting incidents triggers learning, not punishment) and quarterly internal audits that nobody skips — not even the CEO.
Four operational pillars
Saying we're responsible isn't enough. Here's how we prove it, every day.
Safety Management System active from flight one. Hazard reporting, risk assessment, just culture, FOQA — not a contract appendix, the operating system.
RBAC 91 or 135, 100% traceable documentation, audit-ready for ANAC at any time. Internal quarterly audit before the external one needs to look.
Automatic CO₂ calculation per flight, annual impact report and SAF (Sustainable Aviation Fuel) roadmap per aircraft.
Procedures based on IS-BAO Stage 2 (in progress), NBAA Best Practices and Wyvern Wingman. No reinventing the wheel — using the best one available.
What this guarantees
Commitments in writing
Each item below is a contractual clause. If we miss it, you have specific rights.
Response SLA for operational emergencies, 24/7
Adjustment period with full refund
Independent external audit available to the client
Documentary traceability — every decision logged
Tolerance for out-of-MEL/CDL procedure
ANAC notification SLA after any reportable occurrence
Let's talk
In 30 minutes we walk through each of these commitments with documentary references. No vague promise, no 'trust us'.
Reply within 4 business hours · Mon–Fri 8am–7pm BRT